Friday, June 24, 2005


After marveling at the work done on the spire (by the builders, not by us) David turned his attention to the top of the bumpa. He felt we should address the pitting and grade of the surface, to ensure water doesn't pool and lead to degrading the of the structure over time (freeze/thaw is wicked to concrete)... Posted by Hello

No comments: